Centrifuges are used in a large number of chemical, petroleum, food, pharmaceutical, beneficiation, coal, water treatment, and marine labs. How to be installed before use?

1. Power supply voltage: The voltage fluctuation must meet the national standard of less than 10%, otherwise some manufacturers' centrifuges cannot operate normally. If the voltage fluctuates above this, it is recommended to use a voltage regulator to comply with this grid.

2. The ground wire must be in prison: The wiring of the room's power supply must meet the requirements. Our country is a three-phase, four-wire system. The three phases are the three phases of industrial power. When three-phase power is used, the neutral wire is separated from the ground wire. What is more important is whether it is three-phase industrial power or general single-phase power. The ground wire should be reliable so as to avoid leakage. The ground wire cannot be connected to the heating pipe or water pipe.

3. The ground should be smooth and firm: For large centrifuges, the floor must be firmly moved at the installation site to ensure that the rotor of the centrifuge can work normally without any recesses. The ground at the installation and fixing site should be flat and firm.

4. Find a good level: Find a small, accurate leveler, open the lid of the centrifuge, find the level on the spindle, and find the level by adjusting the adjustment screw on the side of the four casters. Note that one of the feet cannot be lost. .